Skip to content

Land Use & Transportation Committee Notes for September 2026

  • by
Image shows two examples of sidewalks in the public right-of-way. The first is a damaged segment of sidewalk that presents a trip hazard with an abrupt edge and difference in surface heights. The second is a recently repaired segment of sidewalk that allows for the free movement of people walking or rolling with no visible barriers present.

Discover & Create Your Neighborhood at the Land Use & Transportation Committee.

Share these resources for anyone interested in learning more.

ADA Title II Public Right-of-Way Transition Plan 5-Year Update

Image shows two examples of sidewalks in the public right-of-way. The first is a damaged segment of sidewalk that presents a trip hazard with an abrupt edge and difference in surface heights. The second is a recently repaired segment of sidewalk that allows for the free movement of people walking or rolling with no visible barriers present.

The draft ADA Title II Public Right-of-Way Transition Plan 5-Year Update outlines the Portland Bureau of Transportation’s strategy to improve accessibility in Portland’s public right-of-way and meet ADA Title II requirements. The Transition Plan creates an actionable framework for improving access across Portland’s public right-of-way. It also fulfills the Portland Bureau of Transportation’s strategic goal of safety, moving people and goods, and asset management.

Discussion covered the plan’s legal requirements, scope, and efforts to address barriers such as curb ramps, sidewalks, accessible parking, signals, transit stops, and temporary street-use events. Most accessibility improvements occur through capital projects and deliver over 1,500 curb ramps every year that meet current accessibility standards. Limited funding is available to upgrade about 100 locations annually by request. There are over 38,000 corner curbs citywide with many installed in prior centuries before federal legislation on accessibility existed. The Transition Plan is an ongoing effort that is continuously being refined with community input.

Provide feedback on the draft plan through Friday, September 25, 2026.

  • Visit ADA Title II Public Right-of-Way Transition Plan Implementation
  • Review the Draft ADA Title II Public Right-of-Way Transition Plan 5-Year Update
  • Download Presentation Slides
  • Provide feedback by Friday, Sep. 25th by completing this Short Survey
  • Sign up for Email Updates
  • Contact Project Staff or call 503-823-5703
  •  

     
    Ways to provide feedback:

    • You can submit comments to ADATransitionPlan@PortlandOregon.Gov
    • You can call PBOT’s ADA Coordinator at 503-823-5703 to leave a message with your thoughts on the plan.
    • You can take this Short Survey.

     

     

    Translate »

    Now accepting Community Small Grant Applications Through 10/18